Installation Process & Precautions of SPC Vinyl Flooring

It is often said that SPC flooring are easy installation by oneself . However, there are still something to be aware of during pavement . So ,today, Kingup manufacturer will explained the installation precautions and method of SPC flooring specifically to you.

The flatness of the ground will affect the pavement effect and the performance of SPC flooring . When install the floor, the base must be flat, solid , dry and the ground surface shall be free of sand.

Surface humidity: the water content of the ground foundation is less than 8%, and the surface shall be dry before construction.

Ground cracks: if there are cracks in the foundation settlement, the width of the cracks shall not exceed 1.0mm.

Ground compactness: the surface of the ground shall not be too rough, there shall not be too many pores, not to mention holes and potholes. The surface of the ground shall be flat and smooth.

Before the SPC flooring pavement, it is necessary to do a good job of installation preparation. Only when it is done well in the early stage can it be better installed.

Some problems in the installation process are mainly meticulous, serious and do not let go of any problems. We recommend to find a professional installation engineer to install, although the price will be higher, but it will be very reassuring.

The flatness of the ground will affect the pavement effect and the performance of SPC flooring . When install the floor, the base must be flat, solid , dry and the ground surface shall be free of sand.

Surface humidity: the water content of the ground foundation is less than 8%, and the surface shall be dry before construction.

Ground cracks: if there are cracks in the foundation settlement, the width of the cracks shall not exceed 1.0mm.

Ground compactness: the surface of the ground shall not be too rough, there shall not be too many pores, not to mention holes and potholes. The surface of the ground shall be flat and smooth.

Installation Process

▪The B plate tenon plate A inclined in the fillster locking and then put it flat.

▪After put it flat ,the B plate and C plate spacing about 2-3 mm ,into parallel lines.

▪Lift up the plates A  and  B  at the same time (note :with the ground at a 45 degree angle )

▪The B plate along C plate  direction, flat push until locked .

▪With the palm of your hands, flatten the plates A and B,but do not force to press to the floor .

▪The floors are smooth without slit after installation. If the floors are not smoooth or have slit, they need to be lifted and locked by an  10-30 degree angle.After locking ,floor would be smooth automatically.